Skip to Main Content
Facility Guidelines
County Facility Entry Guidelines
Full Details...
Government
Departments
Services
Community
How Do I...
Home
Departments
Development & Infrastructure
Planning & Zoning
Fee Schedules
Miscellaneous Permits
Miscellaneous Permits
Erosion Control Permits
Item
Fee
Standard (new homes <10% slope)
$185
Site Specific (new homes >10% slope & non-residential < 1/2 acre)
$240
Combination (non-residential >1/2 acre)
$80 per acre ($900 minimum - $3,200 maximum)
Floodplain Development Permits
Item
Fee
Review Application
$110
Development Permit
$160
Fill Permit
$110 + $0.80 per cubic yard ($10,000 maximum)
Home Occupation Permits
Item
Fee
Initial Application
$160
Annual Renewal
$45
Racing Permits
Item
Fee
Entire Season
$1,000
Per Racing Event
$100
Telecommunications Structures & Wind Energy Conversion Systems
Item
Fee
New supporting structure (telecommunications tower)
$25 per vertical foot ($1,250 minimum)
Co-location on Existing Supporting Structure (telecommunications tower)
$1,250
Commercial Wind Energy Conversion System
$25 per vertical foot / tower ($1,250 minimum)
Small Wind Energy Conversion System
$250 / per tower
Technology Fee, Per Permit*
$45
Solar Energy Equipment
Item
Fee
0-10 kilowatts (kW)*
$250
11-50 kilowatts (kW)*
$350
51-100 kilowatts (kW)*
$500
101-500 kilowatts (kW)*
$1,000
501-1000 kilowatts (kW)*
$2,500
1000-2000 kilowatts (kW)*
$5,000
Over 2000 kilowatts (kW)*
$5,000 + 100 per kW
Solar Energy Generation Facility Plan Review
$400 base fee + $50 fee per 50,000 cubic feet
*Kilowatts based on system maximum output on the load side of the inverter.
Building Permits
Platting
Miscellaneous Permits
Miscellaneous Services
Stop Work Orders
Zoning Board of Appeals
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow